Private Financial Firm,
Canary Wharf
“The benefit of Powertrack has been its robustness during the strip-out and the fact I’ve had full power and lighting from day 1. There is no way the normal temp approach would have worked here.”
Project Name:
Private Financial Firm
Location:
Canary Wharf, London
Principal Contractor:
Mace Interiors
macegroup.com
Project Size:
Powertrack Scope:
Total Powertrack:
Powertrack Added Value:
Large floor plates – Powertrack install speed resulted in having both power and lighting from Day 1.
Highly cellularised floor plate – Powertrack provides power and lighting to all spaces and can grow with the site.
High volume of material on site – Powertrack can be easily modified and relocated to work around material storage.
Phased floors – Re-use of Powertrack enables it to be easily moved from floor to floor.
Project Name:
Private Financial Firm
location:
Canary Wharf, London
principal contractor:
Mace Interiors
macegroup.com
project size:
180,000 sqft
powertrack scope:
Power, task and safety lighting to all areas. Phased project spread over 6 floors.
total powertrack:
366 metres
powertrack added value:
Initial phase of each floor is full strip out – Powertrack being floor-run means it doesn’t get installed at high level which would then need to be stripped out.
Large floor plates – Powertrack install speed resulted in having both power and lighting from Day 1.
Highly cellularised floor plate – Powertrack provides power and lighting to all spaces and can grow with the site.
High volume of material on site – Powertrack can be easily modified and relocated to work around material storage.
Phased floors – Re-use of Powertrack enables it to be easily moved from floor to floor.
endorsement:
“We’ve been really impressed by Powertrack. This is a big project and we have a complex high level strip-out prior to the main construction works.
The benefit of Powertrack has been its robustness during the strip-out and the fact I’ve had full power and lighting from day 1. There is no way the normal temp approach would have worked here.
Now the heavy strip-out is complete I’ve modified Powertrack to suit the layout I need.
It’s unbelievably quick to install and modify – huge day-to-day value to our site operations.”
– Anthony Carroll IEng MCIBSE, Mace Interiors