Case Studies.

Some of our featured projects on site using Powertrack

COMMERCIAL
TO
RETAIL

collaborations
Wates and Overbury
collaborations
isg and mace

SMALL
PROJECTS
TO
LARGE
PROJECTS

isg and mace

GYMS
TO
BANKS

collaborations

ABERDEEN
TO
SOUTHAMPTON

BW and Multitech
Sir Robert McAlpine

BIG
CONSTRUCTION
TO
RESIDENTIAL

Crestel-Contracts-Centrum-Willmott-Dixon

HOSPITALS
TO
WORKPLACES

collaborations
Construction Logistics and Pentalec

Private Financial Firm,
Canary Wharf

“The benefit of Powertrack has been its robustness during the strip-out and the fact I’ve had full power and lighting from day 1. There is no way the normal temp approach would have worked here.”

Project Name:

Private Financial Firm

Location:

Canary Wharf, London

Principal Contractor:

Mace Interiors
macegroup.com 

Project Size:

180,000 sqft

Powertrack Scope:

Power, task and safety lighting to all areas. Phased project spread over 6 floors.

Total Powertrack:

366 metres

Powertrack Added Value:

Initial phase of each floor is full strip out – Powertrack being floor-run means it doesn’t get installed at high level which would then need to be stripped out.

Large floor plates – Powertrack install speed resulted in having both power and lighting from Day 1.

Highly cellularised floor plate – Powertrack provides power and lighting to all spaces and can grow with the site.

High volume of material on site – Powertrack can be easily modified and relocated to work around material storage.

Phased floors – Re-use of Powertrack enables it to be easily moved from floor to floor.

Project Name:

Private Financial Firm

location:

Canary Wharf, London

principal contractor:

Mace Interiors
macegroup.com 

project size:

180,000 sqft

powertrack scope:

Power, task and safety lighting to all areas. Phased project spread over 6 floors.

total powertrack:

366 metres

powertrack added value:

Initial phase of each floor is full strip out – Powertrack being floor-run means it doesn’t get installed at high level which would then need to be stripped out.

Large floor plates – Powertrack install speed resulted in having both power and lighting from Day 1.

Highly cellularised floor plate – Powertrack provides power and lighting to all spaces and can grow with the site.

High volume of material on site – Powertrack can be easily modified and relocated to work around material storage.

Phased floors – Re-use of Powertrack enables it to be easily moved from floor to floor.

endorsement:

“We’ve been really impressed by Powertrack. This is a big project and we have a complex high level strip-out prior to the main construction works.

The benefit of Powertrack has been its robustness during the strip-out and the fact I’ve had full power and lighting from day 1. There is no way the normal temp approach would have worked here.

Now the heavy strip-out is complete I’ve modified Powertrack to suit the layout I need.

It’s unbelievably quick to install and modify – huge day-to-day value to our site operations.”

– Anthony Carroll IEng MCIBSE, Mace Interiors

Powertrack Layout.

Powertrack Case Study